--- Product Description ---
Product Model |
2u 19inch FTTH Rack with 144 Cores LC Duplex Adaptors and Pigtails ODF |
Color |
White or black |
Weight |
3.8kg |
Material |
box cold rolled sheet |
ODF-RS-240 is a 19inch rack mounted fiber optic patch panel that can load 12, 24, SC, LC, FC, ST ... different adapters for max. 48 fiber distribution and connection.
Features and Advantages
1) Standard size, light weight and reasonable structure
2) Splice tray inside changeable
3) Can be used in 19'', 23'' standard distribution frame
4) Suitable for ribbon and single fiber
5) Various panel plate to fit different adapter interface
6)Front mark on the plate is easy for identification and operation
7) 24C, 36C, 48C, 72C 96C 144C optional, with or without fiber optic pigtails and adapters
8) Easy for management and operation
Accessory
Item |
Name |
size |
unit |
Qty |
1 |
Shrinkable sleeve |
45MM*2.6*1.2 |
pc |
Same with fibers capacity |
2 |
Cable tie |
3mm*120mm/white |
pc |
4 |
3 |
PG gland |
M20 |
pc |
2 |
4 |
Plastic Cable ring |
KL-1/20*20/white |
pc |
4 |
Application
1) Telecommunications subscriber loop
2) Fiber to the home (FTTH)
3) LAN/WAN
4) CATV
Operation Conditions
1. Peel the cable , take off the outer and inner housing, as well as loose contract tube, and wash off the filling grease, leaving 1.11.6m fiber and 2040mm steel core.
2. Fix the cable-pressing card and the cable, as well as the cable reinforce steel core.
3. Lead the fiber into the melting and connecting tray, fix heat contract tube and melted tube to one of the connecting fiber.
After melting and connecting the fiber, move heat contract tube and melted tube and fix the stainless (or quartz) reinforce core stick ,make sure the connecting point is in the middle of the housing pipe. Heat the pipe to make the two into one.Put the protected joint into the fiber-laying tray.(one tray can lay 12 cores)
4. Lay the left fiber in the melting and connecting tray evenly, and fix the winding fiber with nylon ties. Use the trays from the bottom up. After all the fiber has been connected, cover the top layer and fix it.
5.Position it and use the earth wire in accordance with the project plan.
--- Factory Overview ---
--- Certificates ---
--- Business Cooperation ---
--- Payment Term ---
--- Advantages ---
--- FAQ ---